PhoenixLiveGantt

A Phoenix LiveView Gantt chart component: horizontal bars on a time axis, dependency arrows between them, sub-projects with roll-up bars, corner badges, click-to-detail popovers, expand/collapse hierarchy, and a built-in geometry audit.

The gantt/1 component is render-only: you give it events with start/enddates and it draws bars, columns, connectors, and frames. It has no concept of durations, working hours, or scheduling. If your domain has durations + an order + sub-projects but no dates, the optional PhoenixLiveGantt.Layout.sequential/2 helper does that translation for you (sequential waterfall, sub-project span, day-aligned min span) with a pluggable calendar callback — see Laying out from durations.

Installation

def deps do
[
{:phoenix_live_gantt, "~> 0.1"}
]
end

There are three wiring steps — deps, JS, and CSS. Skipping the CSS step is the most common mistake; the chart renders but library-specific styling is silently missing (see below).

1. JS hooks

The popover, fade-on-open, and auto-scroll-to-today behaviours need the JS hooks. In your app.js:

import "../../deps/phoenix_live_gantt/priv/static/assets/phoenix_live_gantt.js"
let liveSocket = new LiveSocket("/live", Socket, {
hooks: { ...window.PhoenixLiveGanttHooks, ...myHooks }
})

The bars render without the hooks, but clicking a bar/label won't open its popover and the today-button / auto-scroll won't work.

2. CSS / Tailwind (required)

PhoenixLiveGantt ships no stylesheet. Its visuals are Tailwind utility classes that live inside the component's template (.ex source in deps/phoenix_live_gantt). Tailwind only emits CSS for classes it can see, so you must add the package to your content sources, or library-specific classes (the sub-project pattern-fill, text-[0.6rem] connector labels, non-working-day shading, badge sizing, …) get purged and the chart looks subtly broken.

Tailwind v4 — add an @source to your app.css:

@import "tailwindcss";
@source "../../deps/phoenix_live_gantt/lib";

Tailwind v3 — add a glob to content in tailwind.config.js:

module.exports = {
content: [
"./js/**/*.js",
"../lib/my_app_web/**/*.*ex",
"../deps/phoenix_live_gantt/lib/**/*.*ex"
]
}

PhoenixLiveGantt uses daisyUI semantic color tokens (bg-primary, text-base-content, bg-success, …). daisyUI isn't required — every color is overridable per attr (see bar_default_color_class and friends) — but the defaults assume those tokens resolve to something.

Quick check that CSS is wired: a sub-project's roll-up bar should show a diagonal hatch pattern and connector labels should be legible. If bars are flat-colored and labels invisible, your content source is missing.

Basic usage

<PhoenixLiveGantt.gantt
id="project"
events={@tasks}
date_range={@range}
connectors={@connectors}
zoom={:week}
today={@today}
/>

A task is a PhoenixLiveGantt.Task struct:

%PhoenixLiveGantt.Task{
id: "cut-wood", # unique within the chart; connectors + parent_id reference this
title: "Cut planks to length",
start: ~D[2026-04-01],
end: ~D[2026-04-04], # EXCLUSIVE — see "Dates → bars" below
color: "bg-primary",
assignee: "Sara",
progress_pct: 60,
extra: %{} # badges, actions, parent_id, per-task overrides
}

date_range is a Date.Range (Date.range(first, last)) for the visible axis. Pass id whenever you use the built-in toolbar (show_header) or auto-scroll, and always when more than one chart shares a page — DOM ids and JS dispatches are namespaced by it.

See PhoenixLiveGantt.gantt/1 for the full attr list (there are many styling hooks, all with sane defaults) and PhoenixLiveGantt.Task for all task fields.

Dates → bars

How a task's start/end become a bar — worth reading once, because end being exclusive trips people up:

Sub-projects (hierarchy + roll-up)

Any event becomes a child of another by setting extra.parent_id to the parent event's id. The parent renders as a roll-up bar spanning its descendants, with an expand/collapse chevron and a framed band across both columns.

Three things that aren't obvious and cost me time when I built the first consumer — they're the rules to internalize:

  1. Always include every descendant in events. The library decides an event is a sub-project (and draws the chevron) by finding other events that point at it via parent_id. It then hides the children of collapsed parents itself. So you emit the full tree every render and let expanded control visibility — do not add children only when expanded, or a collapsed parent has nothing pointing at it and never gets a chevron.

  2. Let the parent's dates roll up — pass start: nil, end: nil. A sub-project parent with nil dates is auto-sized to span its descendants' min start / max end. If you instead give the parent explicit dates (e.g. from a rolled-up duration), the library uses those and the children can visually spill outside the bar — you'd have to size the parent to its children yourself. Nil-and-let-it-roll-up is almost always what you want.

  3. on_toggle_expand fires with the param key event-id (hyphen, from phx-value-event-id), and you own the expanded set:

    # render
    <PhoenixLiveGantt.gantt
    events={@events}
    date_range={@range}
    expanded={@expanded} # MapSet | list | :all | nil
    on_toggle_expand="toggle_subproject"
    />
    # the handler — note the hyphenated key
    def handle_event("toggle_subproject", %{"event-id" => id}, socket) do
    expanded = socket.assigns.expanded
    expanded =
    if MapSet.member?(expanded, id),
    do: MapSet.delete(expanded, id),
    else: MapSet.put(expanded, id)
    {:noreply, assign(socket, expanded: expanded)}
    end

expanded accepts a MapSet, a plain list, :all (everything expanded), or nil (all collapsed). Connectors that point at a hidden child are automatically retargeted to its nearest visible ancestor, so arrows never dangle.

Laying out from durations

If your data has durations rather than dates, PhoenixLiveGantt.Layout.sequential/2 turns it into the dates gantt/1 wants — so you don't hand-roll (and re-bug) the waterfall + sub-project-span + day-alignment yourself:

layout =
PhoenixLiveGantt.Layout.sequential(tasks,
start: ~D[2026-06-01],
id: & &1.id,
parent_id: & &1.parent_id, # nil = top-level; others nest
duration: & &1.hours, # opaque — only your :advance interprets it
order: & &1.position,
advance: fn start_date, hours, task ->
# your calendar: weekends, working hours, holidays — all live here
MyApp.Calendar.add(start_date, hours, task)
end
)
# => %{id => %{start: ~D[...], end: ~D[...]}}
events =
Enum.map(tasks, fn t ->
%{start: s, end: e} = layout[t.id]
%PhoenixLiveGantt.Task{id: t.id, title: t.title, start: s, end: e,
extra: %{parent_id: t.parent_id}}
end)

It works entirely in Dates, so each item gets at least a one-day slot (:min_span_days, default 1), siblings never overlap, and a sub-project's bar always spans its laid-out children. The business calendar is yours (the :advance callback); the library stays domain-agnostic. It does not do dependency-driven scheduling, critical path, or resource leveling — supply your own dates for those.

Connectors

Dependency arrows are plain maps referencing event ids:

%{from: "cut-wood", to: "assemble", type: :fs, critical: true, label: "2d lag"}

Debugging

Gotchas

The short list of things that bite, collected from building the first consumer:

Large charts

Horizontal geometry is pure CSS (percent positions, no measurement), so wide timelines are cheap. The cost is the connector router: collision avoidance is roughly O(tasks) per connector, and a chart re-renders/serializes its full HTML over the LiveView socket. A few hundred tasks with dependencies at a fine zoom produces multi-MB diffs and second-scale re-renders. To keep big charts snappy:

Status

Pre-1.0; API may shift. See CHANGELOG for breaking changes.